2025 FLAT 35 DATA

Niigata house construction costs

A prefecture-level benchmark for land-attached custom homes. It is not an estimate specific to a city or neighborhood.

Average construction cost¥37.1M
Average floor area111 m²
Calculated cost / tsubo¥1.1M / tsubo
Survey sample76

Estimated cost by floor area

Floor areaEstimated building costCalculation basis
25 tsubo82.6¥27.5M¥1.1M / tsubo × 25 tsubo¥1.1M / tsubo × 25 tsubo
30 tsubo99.2¥33M¥1.1M / tsubo × 30 tsubo¥1.1M / tsubo × 30 tsubo
35 tsubo115.7¥38.5M¥1.1M / tsubo × 35 tsubo¥1.1M / tsubo × 35 tsubo
40 tsubo132.2¥44M¥1.1M / tsubo × 40 tsubo¥1.1M / tsubo × 40 tsubo

Simple multiplication using the survey-derived unit cost. Site work, design, permits and ground improvement may be additional.

How this differs from neighborhood land prices

Construction cost

Shown at Niigata level because that is the finest reliable geography in this source.

Land price

Calculated from neighborhood-level MLIT transactions and varies substantially by location.

Source and limitations

This survey covers Flat 35 borrowers and is not a census of every custom home.

Japan Housing Finance Agency Flat 35 Survey